Your safety case, ready before the BSR calls.

The offline toolkit that turns the documents you already hold into a BSR-ready safety case. For RTM companies, RMCs and managing agents.

28 days

To submit your application

The BSR no longer calls buildings in by tranche. It now targets buildings on risk, intelligence or incidents, so every Principal Accountable Person needs to be ready within 28 days.

3 Docs

Required for submission

You must submit three core documents: your safety case report, your residents' engagement strategy, and your Mandatory Occurrence Reporting (MOR) information.

c.12,500

Higher-risk buildings

Estimated in England by the BSR. Any one of them could be called in next, regardless of size or previous tranche allocations.

Built to be trusted

Secure, offline, and fully transparent structural and fire data mapping.

Nothing uploaded

Runs entirely offline in Microsoft Edge or Google Chrome. Your sensitive building data never leaves your computer.

People confirm everything

The system provides intelligent mapping suggestions, but nothing is finalized until a competent person checks and confirms it.

Golden thread log

Every change, addition, or review is securely logged by name, building a robust audit trail for the regulator.

Six steps to a BSR-ready report

From scattered documents to a cohesive, compliant safety case.

1

Drop in

Easily drop in your existing reports, certificates, and spreadsheets into the local workspace.

2

Check

Verify the facts, floor plans, and photographic evidence the studio identifies from your files.

3

Review

Map your data against every official BSR criterion, ensuring all claims are backed by solid evidence.

4

Act

Generate specific actions for mitigating missing data, assigning clear owners and target dates.

5

Agree

Finalize major fire and structural risk scenarios collaboratively with your competent assessors.

6

Issue

Generate a fully branded Safety Case Report and structured evidence pack, ready for BSR submission.